Advertise with Data Center Scope

Place your company beside the research and calculators professionals open when they scope a U.S. data center project.

  • One sponsor per research section
  • By application relevant suppliers only
  • Clearly labeled no third-party tracking

Apply for sponsorship

Tell us what your company sells and which section interests you. We reply if there is a fit, with availability and terms.

Your details are used only to reply to you. See the Privacy Policy.

Sponsorship formats

Category sponsorship

One sponsor per research section: Costs, Power, Cooling, Colocation, Reliability or AI Infrastructure. Your name and link appear on the section page and on the guides inside it.

For suppliers whose product maps to one topic, such as cooling equipment or electrical infrastructure.

In-article placement

A labeled sponsor block inside selected guides, placed after the opening sections so it never interrupts the answer a reader came for.

For a specific product tied to a specific question, such as switchgear lead times or liquid cooling cost.

Calculator sponsorship

Your name beside the result of a planning tool, at the moment a reader has just sized a load, a budget or a contract.

For companies that sell what the calculation leads to: capacity, equipment, engineering or software.

The highlighted block shows where the sponsor appears. Every placement is labeled as sponsored and links with a rel="sponsored" attribute.

Who we accept

Sponsorship is by application. Each research section has one sponsor at a time, and we accept only companies whose products or services are useful to the people reading that section. Applications from outside data center infrastructure are declined.

  • Cooling and liquid-cooling equipment manufacturers
  • Electrical infrastructure suppliers: switchgear, transformers, UPS, generators, busway
  • Modular and prefabricated data center builders
  • DCIM, monitoring and energy-management software providers
  • Engineering, commissioning and construction firms
  • Site selection, energy procurement and incentive advisers

Who reads it

Readers arrive from search with a specific question: what a build costs per MW, how long switchgear takes to arrive, what a state offers in tax incentives, how much power a GPU rack draws. Those are the questions of developers, engineers, consultants, investors and infrastructure buyers. Current audience figures are provided on request, taken directly from Google Search Console.

Editorial independence

Sponsorship buys visibility, not conclusions. It does not determine which companies are mentioned, which benchmarks are used or what an article says. The rules are set out in the Methodology and the Editorial Policy.

Prefer email? Write to [email protected] or go back to the application form.