Data Center Scope Tools

Data center economics, turned into usable numbers.

These calculators are built for quick infrastructure screening rather than false precision. Change the assumptions, see how the economics move, and use the result as a starting point for a more detailed model.

Colocation economics Calculator

Colocation Cost Calculator

Model committed kW, utilization, electricity, cross-connects, connectivity, remote hands, contract term and annual escalation.

Total contract cost $/used kW Quote normalization
Energy efficiency Calculator

PUE & Energy Cost Calculator

Convert IT load and PUE into facility MW, annual electricity consumption, infrastructure overhead and energy-cost savings.

Facility MW Annual GWh PUE savings
Development economics Calculator

Data Center Construction Cost Calculator

Model project MW, construction benchmarks, market and AI adjustments, land, utility interconnection, soft costs and contingency.

Total CAPEX Effective $/MW Scenario range
Capacity planning Calculator

Rack Density & Capacity Calculator

Convert available IT MW into practical rack capacity while accounting for reserved headroom and mixed-density deployments.

Usable IT MW Rack capacity Mixed density
Thermal planning Calculator

Data Center Cooling Load Calculator

Convert IT and facility heat into design cooling capacity, BTU/hr and refrigeration tons, then estimate installed units with growth, margin and redundancy.

Cooling kW BTU/hr & tons N+1 sizing
Thermal airflow Calculator

Data Center Rack Airflow Calculator

Convert rack heat and temperature rise into required CFM and m³/h, with air-side heat share, elevation and design margin.

CFM per rack CFM per kW Elevation adjustment
UPS battery planning Calculator

UPS Runtime & Battery Backup Calculator

Estimate battery autonomy from protected load, available energy, condition, discharge derating and UPS efficiency, then calculate the energy required for a target runtime.

Runtime minutes Usable battery kWh Target sizing
How to use them

Useful estimates without pretending the inputs are universal.

01

Start with a realistic case

Use the actual power commitment, utilization, electricity tariff or PUE whenever you have it. Defaults are reference cases, not recommendations.

02

Change one assumption

The most useful result is often not the headline number but how quickly the economics move when utilization, energy price or efficiency changes.

03

Take the result into a full model

Procurement, financing, taxes, utility structures and site-specific engineering can materially change a real project. These tools deliberately expose their boundaries.